step 1

the first side of the AV panel with a framework for lattice is manufactured; later, the second side of the panel is tied-up on the spot.

step 2

reinforcing the AV panel once the two sides are completed.

step 3

transportation of the AV panel.

step 4

putting panels at the site. Panels are always self-supported from within.

step 5

pouring concrete lifts within the AV panel.

step 6

the horizontal structure can be a hollow core slab or a precast slab according to the lighting of the project.

step 7

Pouring concrete at the knots tied-up the entire structure.

The structural façade makes the building to rises closed in its entire perimeter. The floors remains opened, with no columns or any intermediate structure, and ready to install the walls that will eventually separate the interior spaces.

The system can also be combined with metallic structured.